Last Updated on July 25, 2025 by Admin
Construction projects are complex, with many moving parts. Effective scheduling and planning are essential for success, ensuring that the project stays on track, within budget, and completed on time. However, traditional methods often fall short, leading to inefficiencies, delays, and increased costs.
Outbuild, a construction scheduling and planning software addresses the core challenges of construction scheduling and planning by providing simple scheduling and field-first planning in an effort to support on time projects.
Outbuild recently surveyed construction professionals across the United States, including Project Managers, Superintendents, Schedulers, Technology Professionals, Project Engineers, Preconstruction Team Members, Field Coordinators and Executives.
Respondents shared candid feedback on their scheduling tools, collaboration workflows, and the real-world challenges they face in delivering projects on time.
95% of respondents not using Outbuild, believe there is significant room for improvement in their current planning and scheduling processes. (Outbuild Report, 2024)
Table of Contents
The Problem with Traditional Planning Methods
In the construction industry, scheduling and planning are the foundations upon which successful projects are built. Yet, these critical processes are often plagued by disconnection, sluggishness, and a reactive approach.
Many teams rely on a patchwork of multiple tools and manual workarounds, creating obstacles to efficiency and accuracy.

Disconnected Systems Lead to Major Issues
The reliance on disparate systems and manual processes results in several key problems:
- Poor Office-to-Field Coordination: This disconnect leads to misunderstandings, misinterpretations of the schedule, and difficulties in aligning on priorities and progress.
- Wasted Preparation Time: Without integrated tools, significant time is spent manually preparing and reconciling data for meetings and reports.
On average, 76% of non-Outbuild users spend 1-5 hours manually preparing and reconciling data for each OAC meeting. (Outbuild Report, 2024)
- Integration Nightmares: Poor tech stack integration hinders the flow of information, prevents a holistic view of project data, and complicates risk assessment and analysis.
90% of respondents not using Outbuild state their current scheduling tool either does not integrate with their other essential construction software or does so poorly. (Outbuild Report, 2024)
- Increased Project Risk: When data is siloed across different platforms or exists only in manual formats, potential clashes in schedules, resource conflicts, or compliance issues may not become visible until they cause significant problems and delays.

The Consequences of Ineffective Scheduling and Planning
The inefficiencies stemming from traditional scheduling and planning have tangible negative impacts on construction projects:
- Rework and Delays: Disconnected schedules and poor communication frequently lead to rework as teams are not aligned on the latest plans or changes. This also contributes to project delays, pushing back completion dates and potentially incurring penalties.
- Miscommunications: When different stakeholders are working off different versions of the schedule or lack real-time updates, miscommunications are inevitable. These can range from minor misunderstandings to significant errors that impact project progress.
- Lack of Subcontractor Buy-In: Traditional planning often fails to adequately involve subcontractors in the scheduling process. This lack of engagement leads to a sense of disconnection from the plan, reduced ownership, and potentially lower accountability for meeting deadlines.

Outbuild: A Unified Path to Project Success
Outbuild is designed to overcome the limitations of traditional construction scheduling and planning. It offers a unified platform that connects the master schedule with the field’s lookahead plan in a collaborative, real-time environment.
Addressing Core Problems with Innovative Features
Outbuild tackles the fundamental challenges of construction scheduling through several key features:
- Eliminates Disconnected Tools: Outbuild provides a single platform that integrates all aspects of scheduling and planning. This eliminates the need for multiple, disparate tools, reduces busywork associated with manual data transfer and reconciliation, and ensures that all updates are automatically synced across the system.
- Ensures Up-to-Date Schedules: Real-time progress updates from the field are seamlessly integrated into Outbuild. This keeps everyone on the same page with the most current information, reflecting actual progress and any changes on the ground.
- Fosters True Collaboration: Outbuild makes it easy for all stakeholders, including superintendents and subcontractors, to contribute directly to the scheduling process. They can add tasks, flag potential roadblocks, and actively engage with a shared, live plan, fostering a sense of ownership and collaboration.
- Empowers the Field with Lookaheads: Outbuild directly connects lookahead planning with the master schedule, providing field teams with easy, mobile-friendly access (e.g., via iPad). This empowers field personnel to manage their short-term tasks effectively while ensuring alignment with the overall project timeline.
- Simplifies the Complex: Its powerful, built-in analytics provide valuable insights into schedule performance, allowing teams to spot trends, track progress against the plan, and proactively mitigate potential risks.
- Increases Subcontractor Buy-In: Engaging subcontractors directly in the planning process fosters a sense of ownership and accountability, leading to greater commitment to the schedule.
- Improves Risk Management: Outbuild proactively identifies potential risks, such as RFIs, submittals that are lagging, and potential trade clashes. By visualizing these issues in real-time, teams can address them early, preventing them from escalating into costly delays or budget overruns.

The Future of Construction Scheduling
Outbuild exists to solve one of construction’s most persistent challenges: project delays driven by fragmented, reactive, and inefficient workflows.
By unifying master schedules, lookaheads, and field execution in one collaborative platform, Outbuild aligns the field and office—enabling teams to plan proactively, stay connected and turn projects over on time. Outbuild is here to raise the standard—bringing modern tools, real-time visibility, and accountability to the heart of construction.
Source:
Outbuild. Internal Survey Report: Scheduling and Planning Solved. 2024.
Related Posts:
- Construction Planning and Scheduling: A Quick Guide
- 4 Plumbing Issues in Older Properties and How to Fix Them
- Hidden Cost of Lifting: How ‘Manual Handling Training’ Can Save Businesses Thousands and Protect Their Workforce.
- Improving Construction Schedule By Hiring Construction Scheduling Consultant