Project Inputs
Choose a project type and tune assumptions. Fields include state cost index, quality level, and allowances.
Results
Outputs include a breakdown and a planning-level low–high range.
Total Estimate
$0
Cost per Sq Ft
$0 / sf
Range: $0 – $0
Range Confidence
–
Based on inputs and complexity
Breakdown
Category | Amount | Share |
---|
Assumptions & Cost Model
Unit cost ranges (pre-location & quality)
These are typical US planning figures per square foot or per project scope. They are blended costs that include labor, materials, equipment, subcontractors, and general conditions. Adjust with quality, complexity, and location.
Project Type | Basic | Standard | Premium | Unit |
---|
Disclaimer: This tool provides planning-level estimates for budgeting and feasibility. Actual bids vary by scope, product selections, schedule, and market conditions. Always obtain multiple contractor bids and verify permitting and code requirements in your jurisdiction.